Simini

AI-Generated Digital Twin · Fulfillment Center

Boxes shipped0
Robots active0
Pods on the move0
t 0s
Describe your facility. Simini builds the live twin.

Let's build your digital twin

Share your floor photo, zone sketch and order history. I will lay out the storage field, place the pick stations and dock, dispatch the robot fleet, then run tonight's order wave.

Building your digital twin

Reading the floor photo and zone sketch
Laying out the storage field from the sketch, 240 pods, one way aisles
Placing 2 pick stations and the dock from your dock specs
Scheduling tonight's wave from your order history
Dispatching the fleet of 12 robots and validating flow balance
Compiling the live twin

Your digital twin is live

240 pods, 12 robots, 2 pick stations and the outbound dock are running tonight's wave. Open the floor to watch it in real time.

Help me describe it
Use a sample facility
Attach files
Message Simini and attach your facility files
Robotic Fulfillment Center · Live Digital Twin
Play the demo
Back to the deck
Live operations
Fulfillment center
00:00
Order wave complete
Final results over the full run
Throughputlive
0orders / hr shipped
Arrivals
0
orders / hr in
Shipped
0
orders this wave
Fleet12 robots
0% utilized
Productive 0% Blocked 0% Charging 0% Idle 0%
Stations and queueswatch
Pick Station 010%
Pick Station 020%
0
Pods queued
0s
Robot wait
0m
Time to fill
0%
Inventory
0 pods on hand
0 low-stock SKUs
Service level
Fill rate0%
Pick accuracy0%
Stockout riskLow
Top low-stock SKUs5 of 19
SKUOn handDays coverReplenishmentRisk
Bottleneck analysis
Simini diagnosis of the completed run
Pick Station 02 is the binding constraint.

Simulation results

Robotic fulfillment center, tonight's order wave

Run complete

Throughput over time

Orders per hour shipped across the run

Station utilization

Average load per pick station

Order cycle time distribution

Minutes to fill an order across the run

Fleet activity breakdown

Share of fleet time by state
Bottleneck analysis
Simini diagnosis of the completed run

Pick Station 02 is the binding constraint.

Improvement session
Working the Pick Station 02 bottleneck with Simini
thinking